1 Kings 6 - Contemporary English Version (CEV)

The Outside of the Temple Is Completed

6 Solomon's workers started building the temple during Ziv,[a] the second month of the year. It had been 4 years since Solomon became king of Israel, and 480 years since the people of Israel left Egypt.

2 The inside of the Lord's temple was 27 meters long, 9 meters wide, and 13.5 meters high. 3 A four-and-a-half-meter porch went all the way across the front of the temple. 4 The windows were narrow on the outside but wide on the inside.

5-6 Along the sides and back of the temple, there were three levels of storage rooms. The rooms on the bottom level were just over two meters wide, the rooms on the middle level were over two and a half meters wide, and those on the top level were just over three meters wide. There were ledges on the outside of the temple that supported the beams of the storage rooms, so that nothing was built into the temple walls.

7 Solomon did not want the noise of hammers and axes to be heard at the place where the temple was being built. So he gave orders for the workers to shape the blocks of stone at the quarry.

8 The entrance to the bottom storage rooms was on the south side of the building, and stairs to the other rooms were also there. 9 The roof of the temple was made out of beams and cedar boards.

The workers finished building the outside of the temple. 10 Storage rooms just over two meters high were all around the temple, and they were attached to the temple by cedar beams.

11 The Lord told Solomon:

12-13 If you obey my commands and do what I say, I will keep the promise I made to your father David. I will live among my people Israel in this temple you are building, and I will not desert them.

14 So Solomon's workers finished building the temple.

The Inside of the Temple Is Furnished

(2 Chronicles 3.8-14)

15 The floor of the temple was made out of pine, and the walls were lined with cedar from floor to ceiling.[b]

16 (A) The most holy place was in the back of the temple, and it was nine meters square. Cedar boards standing from floor to ceiling[c] separated it from the rest of the temple. 17 The temple's main room was 18 meters long, and it was in front of the most holy place.

18 The inside walls were lined with cedar to hide the stones, and the cedar was decorated with carvings of gourds and flowers.

19 The sacred chest was kept in the most holy place. 20-22 (B) This room was nine meters long, nine meters wide, and nine meters high, and it was lined with pure gold. There were also gold chains across the front of the most holy place. The inside of the temple, as well as the cedar altar in the most holy place, was covered with gold.

23 (C) Solomon had two statues of winged creatures[d] made from olive wood to put in the most holy place. Each creature was four and a half meters tall 24-26 and four and a half meters across. They had two wings, and the wings were just over two meters long. 27 Solomon put them next to each other in the most holy place. Their wings were spread out and reached across the room. 28 The creatures were also covered with gold.

29 The walls of the two rooms were decorated with carvings of palm trees, flowers, and winged creatures. 30 Even the floor was covered with gold.

31-32 The two doors to the most holy place were made out of olive wood and were decorated with carvings of palm trees, flowers, and winged creatures. The doors and the carvings were covered with gold. The door frame came to a point at the top.

33-34 The two doors to the main room of the temple were made out of pine, and each one had two sections[e] so they could fold open. The door frame was shaped like a rectangle and was made out of olive wood. 35 The doors were covered with gold and were decorated with carvings of palm trees, flowers, and winged creatures.

36 The inner courtyard of the temple had walls made out of three layers of cut stones with one layer of cedar beams.

37 Work began on the temple during Ziv,[f] the second month of the year, four years after Solomon became king of Israel. 38 Seven years later the workers finished building it during Bul,[g] the eighth month of the year. It was built exactly as it had been planned.

Footnotes

  1. 6.1 Ziv: The second month of the Hebrew calendar, from about mid-April to mid-May.
  2. 6.15 from floor to ceiling: One possible meaning for the difficult Hebrew text.
  3. 6.16 standing … ceiling: One possible meaning for the difficult Hebrew text.
  4. 6.23 statues of winged creatures: These were symbols of the Lord's throne on earth (see Exodus 25.18-22).
  5. 6.33,34 two sections: One possible meaning for the difficult Hebrew text.
  6. 6.37 Ziv: See the note at 6.1.
  7. 6.38 Bul: The eighth month of the Hebrew calendar, from about mid-October to mid-November.

Cross references

  1. 6.16 : Ex 26.31-34.
  2. 6.20-22 : Ex 30.1-3.
  3. 6.23-28 : Ex 25.18-20.

You Might Also Like:

1 Kings 6 - Young's Literal Translation (YLT)

6 And it cometh to pass, in the four hundred and eightieth year of the going out of the sons of Israel from the land of Egypt, in the fourth year -- in the month of Zif, it [is] the second month -- of the reigning of Solomon over Israel, that he buildeth the house for Jehovah. 2 As to the house that...
Read More

1 Kings 6 - Wycliffe Bible (WYC)

6 Forsooth it was done in the four hundred and fourscore year of the going out of the sons of Israel from the land of Egypt, in the fourth year of the realm of Solomon (in the fourth year of Solomon’s reign), in the month Zif; that is, the second month of the fourth year of the realm of Solomon on I...
Read More

1 Kings 6 - World English Bible (WEB)

6 In the four hundred and eightieth year after the children of Israel had come out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month Ziv, which is the second month, he began to build Yahweh’s house. 2 The house which king Solomon built for Yahweh had a length of ...
Read More

1 Kings 6 - The Voice (VOICE)

6 During the second month called Ziv in the 4th year of Solomon’s reign, 480 years after the Israelites had departed from Egypt, Solomon began constructing the Eternal’s temple. The timing of the construction of the temple reveals the incredible importance of this event. First, by connecting its con...
Read More

1 Kings 6 - Tree of Life Version (TLV)

Building the Temple6 Now it came to pass, 480 years after the children of Israel came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month Ziv (which is the second month), that he began to build Adonai’s House. 2 Now the House that King Solomon built for Adonai ...
Read More

1 Kings 6 - Revised Standard Version Catholic Edition (RSVCE)

Solomon Builds the Temple6 In the four hundred and eightieth year after the people of Israel came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, which is the second month, he began to build the house of the Lord.[a] 2 The house which King Solomon b...
Read More

1 Kings 6 - Revised Standard Version (RSV)

Solomon Builds the Temple6 In the four hundred and eightieth year after the people of Israel came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, which is the second month, he began to build the house of the Lord. 2 The house which King Solomon buil...
Read More

1 Kings 6 - New Revised Standard Version, Anglicised (NRSVA)

Solomon Builds the Temple6 In the four hundred and eightieth year after the Israelites came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, which is the second month, he began to build the house of the Lord. 2 The house that King Solomon built for t...
Read More

1 Kings 6 - New Revised Standard Version (NRSV)

Solomon Builds the Temple6 In the four hundred eightieth year after the Israelites came out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, which is the second month, he began to build the house of the Lord.(A)2 The house that King Solomon built for the ...
Read More

1 Kings 6 - New Living Translation (NLT)

Solomon Builds the Temple6 It was in midspring, in the month of Ziv,[a] during the fourth year of Solomon’s reign, that he began to construct the Temple of the Lord. This was 480 years after the people of Israel were rescued from their slavery in the land of Egypt. 2 The Temple that King Solomon bui...
Read More

1 Kings 6 - New Life Version (NLV)

Solomon Builds the House of God6 In the 480th year after the people of Israel came out of the land of Egypt, in the fourth year of Solomon’s rule over Israel, in the month of Ziv, the second month, he began to build the house of the Lord. 2 The house which King Solomon built for the Lord was as lon...
Read More

1 Kings 6 - New King James Version (NKJV)

Solomon Builds the Temple(A)6 And (B)it came to pass in the four hundred and [a]eightieth year after the children of Israel had come out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of [b]Ziv, which is the second month, (C)that he began to build the house of ...
Read More

1 Kings 6 - New International Version - UK (NIVUK)

Solomon builds the temple6 In the four hundred and eightieth[a] year after the Israelites came out of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, the second month, he began to build the temple of the Lord. 2 The temple that King Solomon built for the Lord was sixty...
Read More

1 Kings 6 - New International Version (NIV)

Solomon Builds the Temple(A)6 In the four hundred and eightieth[a] year after the Israelites came out of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, the second month,(B) he began to build the temple of the Lord.(C) 2 The temple(D) that King Solomon built for the Lo...
Read More

1 Kings 6 - New International Reader's Version (NIRV)

Solomon Builds the Temple6 Solomon began to build the temple of the Lord. It was 480 years after the Israelites came out of Egypt. It was in the fourth year of Solomon’s rule over Israel. He started in the second month. That was the month of Ziv. 2 The temple King Solomon built for the Lord was 90 f...
Read More

1 Kings 6 - New English Translation (NET)

The Building of the Temple6 In the four hundred and eightieth year after the Israelites left Egypt, in the fourth year of Solomon’s reign over Israel, during the month Ziv[a] (the second month), he began building the Lord’s temple. 2 The temple King Solomon built for the Lord was 90 feet[b] long, 3...
Read More